Precast Wash Trough · Malaysia
Mud tracked from construction and quarry sites onto public roads can cause complaints, cleanup delays and site-management issues. Our precast wheel wash trough removes mud and debris from vehicle tyres before they leave the site, supporting cleaner access roads, improved site housekeeping and local-authority requirements.
Get a Quotation View Specifications WhatsApp for Quotation
A precast wash trough is a reinforced-concrete wheel-washing system positioned at a site exit. Construction vehicles drive through the trough while water removes mud and debris from their tyres before they reach public roads. Seginiaga Trading supplies and delivers precast wash trough systems coordinated through qualified precast manufacturing partners.
| Parameter | Value |
|---|---|
| Overall dimensions (W × L × H) | 9000 mm × 3810 mm × 912 mm |
| Configuration | Four precast reinforced-concrete modules |
| Individual module width | Approximately 2100 mm |
| Wash trays | Four removable wash trays |
| Pipework | 150 mm uPVC pipes |
| Supports | Steel UB supports |
| Lifting provision | Cast-in lifting anchors |
| Concrete strength | 30 MPa |
| Reinforcement yield strength | 500 N/mm², according to the supplied drawing |
| Approximate module weight | 6.5 tonnes each |
| Standard load rating | 30 tonnes |
| Heavy-duty option | Up to 60 tonnes, subject to technical confirmation |
| Associated component | Precast U-drain or sump arrangement |
| Typical lead time | 3–4 weeks |
Dimensions and configurations shown are for general reference. Final details are subject to project requirements, site conditions, confirmed quotation and technical confirmation.
Latest supplied technical drawing: 9000 mm (W) × 3810 mm (L) × 912 mm (H).
Supply and delivery only unless otherwise stated in the confirmed quotation.
Standard system components: Four precast reinforced-concrete modules; Four removable wash trays; Steel UB supports; 150 mm uPVC pipes; Cast-in lifting anchors; Associated sump or U-drain components according to the confirmed scope.
Unloading, crane services, installation, excavation, foundations, drainage connections and other civil works are excluded unless separately quoted.
How long does delivery take? Typical lead time is approximately 3–4 weeks after order confirmation, subject to production scheduling and delivery location.
What load rating does the standard system support? The standard system is rated for 30 tonnes. A heavy-duty option of up to 60 tonnes may be available subject to technical confirmation.
Is installation included? No. The standard scope is supply and delivery only. Unloading, crane services, installation and civil works are excluded unless separately quoted.
Where does Seginiaga deliver? Delivery is available across Peninsular Malaysia, subject to transportation access and the confirmed quotation.
How do I request a quotation? Send the company name, project location, required delivery date, expected vehicle type and relevant site information through WhatsApp or the enquiry form.
Send us your company details, project location, required delivery date and expected vehicle type for a preliminary quotation.
This is a preliminary product proposal. Final configuration, load requirements, delivery scope and pricing are subject to site conditions and technical confirmation.